video

Webinars
News and Views
Shows and Events
TimberStrong FAQs

Free TimberStrong Planning Guide
Commercial Applications
  • Docks
  • Floating Docks
  • Boardwalks
  • Gangways
  • Piers
  • Handicapped Ramps
  • Stair Treads
  • Stair Landings
  • Decks
  • Roof Top Decks
  • Animal Kennel Floors
  • Linked In you tube
    -- Return to Case Studies Page --

    Case Study #2
    Green Herron Docks, Jacksonville, Fl

    Green Heron Docks Side Veiw of Pier
    Ecologically freindly walkways Pre-assembled Deck Panels on finished Dock
    Installation over ecologically sensitive marshland. Laying the deck panels.
    Deck Panels being put into place prior to being "clicked" together. Work 4 times faster!
    Just tap panels with a hammer to "click" together. Fasten deck panels through the fastener not the deck surface.
    • Name of Project: Green Heron Docks, Jacksonville, Fl

    • Description: A residential pier consisting of nearly 1,300 square feet of decking.

    • Challenge: Green Heron has developed a “top down” construction method, greatly reducing impact upon the natural vegetation under piers. This construction method eliminates disturbing the fragile ecosystem in the area of construction. In addition to the construction of the substructure, they were looking for a decking solution that was eco-friendly, while being economical to install.

    • TimberStrong Solution: TimberStrong suggested the use of composite decking for the project. Once accepted, 5-foot-wide panels were manufactured for the main pier section and 12-foot-wide panels were made for the terminal end of the dock. Materials were delivered to the job site and installed by 2 carpenters in only 8 hours.
    Sign Up to Receive a Free Planning Guide
    A value is required.

    If not a company, enter "Not a Company"

    A value is required. Invalid format.



    Please select..

    Invalid format.