    TimberStrong clients have had numerous projects, each one unique and with its own set of challenges. In each case, TimberStrong not only was able to reduce the overall cost of the project, by reducing labor cost and on-site time, but the TimberStrong system also enabled the clients to better meet and overcome the project's challenges.



    Case Study #1 - Quaker Penn Park
    Quaker Penn Park
    Quaker Penn Park, owned by Falls Township, PA, is a public access boat ramp that was constructed in 2010 / 2011. This boat ramp is flanked by two floating docks, one on each side of the ramp.
    Click Here to See Case Study #1 and Project Gallery
    Case Study #2 - Green Heron Docks
    Green Heron Docks
    Green Heron Docks built a residential pier consisting of nearly 1,300 square feet of decking in environmentally sensitive wetlands.
    Click Here to See Case Study #2 and Project Gallery
    Case Study #3 - West Wildwood, NJ
    West Wildwood, NJ
    Created by Board Safe, this residential waterfront access in West Wildwood, NJ is 8-foot by 20 foot dock and 3’-6” by 21-foot gangway; both decked with grooved Ipe decking.
    Click Here to See Case Study #3 and Project Gallery
    Case Study #4 - Jarrett Nature Center
    Jarrett Nature Park
    Jarrett Nature Center, Hatboro - Horsham School District built an observation platform measuring 6-feet wide by 50-feet long to facilitate access to local natural habitats for their students and local residents.
    Click Here to See Case Study #4 and Project Gallery
    Case Study #5 - Freedom Elite, Entertainment Cruises
    Freedom Elite, Penn's Landing
    Penn’s Landing located on the Delaware River in Philadelphia, PA, is the homeport for Entertainment Cruises newest cruise ship, Freedom Elite.  The project required decking for the 4-foot by 80-foot gangway and gangway landing.
    Click Here to See Case Study #5 and Project Gallery