TimberStrong clients have relied on us for numerous projects, each one unique and with its own set of challenges. In each case, TimberStrong was not only able to reduce the overall cost of the project by reducing labor cost and on-site time—the TimberStrong system also enabled clients to better meet and overcome the project’s challenges.
A major rowing center in the country is Boathouse Row in Philadelphia. Rowers compete at every level, including local clubs, high schools, colleges, summer racing programs, and international-level athletics.
“Using Ipe TimberStrong deck panels allowed us to build our customer a beautifully finished product without eating into our bottom line labor costs, taking considerably less time than we budgeted.”
TimberStrong manufactured 6-foot-wide panels with composite decking. Panels were shipped to the job site and all 300 square feet of decking installed by a single carpenter in 2 hours.
TimberStrong suggested the use of composite decking for the project. Materials were delivered to the job site and installed by 2 carpenters in only 8 hours.